Between the dates 07/01/2025 – 02/05/2025, on Kremmastis Street in Episkopi, a roundabout construction work will be carried out by a private contractor. During the work, the following regulations will apply: • A section of Kremmastis Street will be closed and traffic will be diverted through Achaion and Argous Streets. • Also, the exit from the Paphos - Limassol motorway towards Limassol at the Episkopi junction will be closed and traffic from the motorway to Episkopi will be diverted through the immediately following Kantou junction.
Larnaca - Famagusta Motorway On the Larnaca Airport - Ayia Napa motorway, during the period 13/01/2025-31/03/2025, excluding weekends and holidays, between the hours of 08:30-14:30, the Department of Forestry will carry out green pruning work on the slopes of the motorways. During the work, part of the shoulder of the motorway will be closed in sections in both directions. Traffic will continue to flow freely in the lanes. During the period 02/04/2025 – 13/06/2025, excluding weekends and holidays, between the hours of 08:30-14:30, pruning and watering works will be carried out on the slopes of the Larnaca Airport-Paralimni motorway, in both directions, by the Department of Forestry. During the works, part of the shoulder of the motorway will be closed, in sections of 300 meters at a time. Traffic will not be affected. Larnaca-Kofinou Motorway On the Larnaca-Kofinou Motorway, during the period 13/01/2025-31/03/2025, excluding weekends and holidays, between the hours of 08:30-14:30, the Department of Forestry will carry out green pruning work on the sides of the motorways. During the work, part of the shoulder of the motorway will be closed in sections in both directions. Traffic will continue to flow freely in the lanes. From Monday 24/02/2025 to Friday 28/03/2025, excluding Sundays and holidays, between the hours of 08:30 – 15:00, work will be carried out to cut and prune acacias and other trees on the shoulders and slopes of the Larnaca – Kofinou motorway, in both directions, including the Interchanges. During the work, part of the shoulder of the motorway will be closed in sections. Traffic will continue to flow unhindered in the traffic lanes. On Monday 31/03/2025, between the hours of 09:00 – 13:00, local repair work will be carried out on the road surface of the Larnaca – Kofinou motorway, opposite the entrance to the Nicosia – Limassol motorway. During the works, the left lane of the motorway will be closed for a distance of approximately 1 kilometer and traffic will be diverted to the right lane. On Wednesday 02/04/2025, between the hours of 09:00 – 13:00, local repair works will be carried out on the road surface of the Larnaca – Kofinou motorway, opposite the entrance to the Nicosia – Limassol motorway. During the works, the right lane of the motorway will be closed for a distance of approximately 1 kilometer and traffic will be diverted to the left lane. During the period 02/04/2025 – 13/06/2025, excluding weekends and holidays, between the hours of 08:30-14:30, pruning and watering works will be carried out on the slopes of the Larnaca-Kofinou motorway, in both directions, by the Forestry Department. During the works, part of the shoulder of the motorway will be closed, in sections of 300 meters at a time. Traffic will not be affected. From Thursday 03/04/2025 until Friday 11/04/2025, excluding weekends, between the hours of 08:30 – 14:30, local repairs of the road surface and cleaning of the shoulders of the Kofinou-Larnaca motorway will be carried out. During the works, the left lane of the motorway will be closed in sections for a distance of approximately 1 kilometer and traffic will be diverted to the right lane. Larnaca-Nicosia Motorway During the period 02/04/2025 – 13/06/2025, excluding weekends and holidays, between the hours of 08:30-14:30, pruning and watering works will be carried out on the slopes of the Larnaca-Nicosia motorway, Larnaca District, in both directions, by the Forestry Department. During the works, part of the shoulder of the motorway will be closed, in sections of 300 meters at a time. Traffic will not be affected. Limassol-Nicosia Motorway On the Limassol-Nicosia Motorway, after the opening to traffic on Saturday morning 25/01/2025 of the Kalavasos Bridge in the direction from Nicosia to Limassol, after the completion its maintenance / repair, during the period 30/1/2025 – 15/5/2025, the corresponding upgrade / repair works of the bridge in the direction of Limassol - Nicosia will be carried out. During the works, the two lanes of the motorway in the direction of Nicosia for a length of approximately 1 km will be closed to traffic. Traffic will be diverted to the opposite traffic flow, which will operate in two-way traffic. Also, the entrance to the motorway, in the direction of Limassol from the old Limassol - Nicosia road at the Zygi junction will be closed and traffic from the old road to the motorway will be diverted via the Governor's Beach junction. On Monday 31/03/2025 and Wednesday 02/04/2025, from 20:00 in the evening until 05:30 in the morning of the following day, road removal and resurfacing works will be carried out on the Nicosia - Limassol motorway at the height of the Kalamon bridge in the direction of Limassol. For this purpose, traffic will be diverted via the Kalamon interchange to the old Nicosia - Limassol road and then via the GSP interchange back to the motorway. Limassol-Paphos Motorway From Wednesday 12/02/2025 until Wednesday 16/04/2025, between the hours of 07:30 – 15:00, daily, except weekends, embankment removal works will be carried out on sections of the Limassol – Paphos motorway, from the New Limassol Hospital exit, to the Petra tou Romiou exit and on sections of the bypass road in both directions. During the works, the emergency lane (hard shoulder) of the motorway will be closed in sections over a length of approximately 200m, at all times. From Monday 31/03/2025 until Friday 04/04/2025, excluding holidays, between the hours of 08:30 – 15:00, pruning works will be carried out on the motorway (A6), in the direction from Limassol to Paphos. During the works, the left lane will be closed in sections over a length of approximately 1 km and traffic will be diverted to the right lane. Nicosia District In Lakatamia, works will be carried out on Tseriou Avenue and Strovolos Street, from Spyrou Kyprianou Avenue to Pefkou Street, from Friday 12/05/2023 and for a period of 20 months, as part of the improvement/construction of Ippokratous Avenue, Argyroupoleos Avenue and Section of Tseriou Avenue and Strovolos Street. At the same time, during the same period, as part of the reconstruction of Ippokratous Avenue, Themistokleous Street and Areos Avenue will be closed from their intersection with Themistokleous Street to Nikaias Street and Kentavrou Street respectively. In Lakatamia, as part of the improvement/construction of Ippokratous Avenue, from Friday 07/02/2025 at 11:00 in the morning, and for a period of approximately 4 months, part of Karavostasiou Street will be temporarily closed to traffic, from its intersection with Agiou Amvrosiou Street to its intersection with Ippokratous Avenue. All movements to and from Ippokratous Avenue will be made via Vatylis Street. Traffic from Themistokleous Street to Ippokratous Avenue and vice versa will be conducted via Nikaias Street. In Nicosia and Aglantzia, as part of the project “Improvement of Famagusta Avenue in Nicosia”, works lasting 24 months are underway from 20 February 2025, which are expected to be completed by 22 February 2027. Specifically, Famagusta Avenue is included from its junction with Kalavryton Street to the Sopaz roundabout, approximately 1.7 km long. and a secondary road network approximately 0.8 km long, consisting of a section of Kalavryton, Paphos, Madaris and Semelis streets. Limassol District Larnaca District On the Mazotos-Zygiu road, on a bridge before the exit to Maroni, in the direction of Zygi, during the period 06/03/2025 – 28/03/2025, between the hours of 07:30 – 15:00, excluding weekends and holidays, bridge maintenance work will be carried out. During the work, one lane of traffic will be closed, approximately 50m long, and traffic will be diverted to the opposite lane, using STOP and GO signs. Paphos District On the old Paphos-Limassol road, during the period 13/5/2024 – 12/5/2025 (for 12 months), construction works will be carried out to stabilize a section of the road, near Petra tou Romiou (near the CTO refreshment bar in Petra tou Romiou). During the works, the section of the road being reconstructed will not be available for traffic. There will be continuous and unhindered traffic movement on both sides of the construction site. Traffic on the old Paphos-Limassol road in the direction from Paphos to Limassol will be diverted from the Petra tou Romiou exit (after Aphrodite Hills on the left) and from Limassol / Pissouri to Paphos from the Pissouri exit, on the Paphos-Limassol motorway. Also on the old Paphos-Limassol road, at the section near Petra tou Romiou, during the period between 17/06/2024 and 16/06/2025, construction works for road stabilization measures will be carried out. Specifically, the works will be carried out to stabilize the slope and the road surface, as part of the 2nd Phase of the works being carried out on the road, following the major landslides that had occurred since 2019. During the works period, 17/06/2024-16/06/2025, a section of the old Limassol-Paphos road, near Petra tou Romiou, will be temporarily closed to traffic in both directions towards Paphos and towards Limassol. The temporary signage will be the same as in the 1st Phase of Works. Specifically, the necessary signage and information will be placed on the parallel section of the Limassol-Paphos motorway, as well as on the two cut-off sections on the old Limassol-Paphos road, near the western Pissouri-Petra tou Romiou exit and near the Kouklia exit, to inform drivers intending to head towards Petra tou Romiou.