Pafos Live 8 February 2025
The Electricity Authority announces that on Monday 10/02/2025 the mass installation of smart meters begins in all EAC Regions in the following areas:
Nicosia: Between Stasinou and Digeni Akrita streets,
Digeni Akrita and John F. Kennedy
Limassol: Germasogeia and Agios Athanasios along the coast
Enaerios – Neapoli
Larnaka: Finikoudes area
Paphos : Kato Paphos
We remind you that for the safe replacement of the meter, the interruption of the supply is required for a period not expected to exceed 20 minutes. The Authority apologizes for any inconvenience.
