On the Limassol-Paphos highway, in the section from Erimi to the Bridge over Petra tou Romiou, in the period 28/5/2024 – 15/12/2024, except Fridays, weekends and holidays, between the hours 07:00 – 15:30 , plantation watering works will be carried out within the central island, by the Forestry Department. During the works, the right traffic lane in one direction of the road will be partially closed for a length of 200m. and traffic will be diverted to the left lane. Also on the Limassol-Paphos highway, in the period 04/11/2024-08/11/2024, between the hours of 08:00-19:00, the Department of Electromechanical Services will carry out maintenance work on the highway tunnel, heading towards Limassol and in the period 11/11/2024-15/11/2024, at the same times, in the direction of Paphos. During the works the tunnel will be closed and the traffic before the motorway tunnel will be diverted to the opposite traffic flow which will operate in two-way traffic.
On highways in the province of Larnaca, in the period 11/9/2024 – 7/11/2024, from Monday to Thursday, pruning and watering works will be carried out by the Forestry Department, as follows: (a) In the period 11/9/2024 – 7/11/2024, between the hours 08:30 – 14:30, pruning work will be carried out on the slopes and it will be closed in sections every 500m. part of the footing on the Larnaca Airport-Agia Napa motorway, from Larnaca Airport to the ¨Rizoelias' roundabout and on the Larnaca-Kofinou motorway from the Kalos Chorio roundabout to Kofinou in both directions, and (b) In the period 16/9/2024 – 19/9/2024, between the hours 08:30 – 15:30, irrigation works will be carried out on the central island of the Larnaca – Kofinos highway, from the Kalos Chorio roundabout to Kofinos and the acceleration lane will be partially closed every 1.5 km in the direction of Kofinou On the Larnaca-Agia Napa highway, in the section past the Kalos Chorio roundabout, as well as on the Kalos Chorio-Mosfiloti road, from Monday 04/11/2024 until Saturday 09/11/2024, between the hours of 08:30 - 16:00, cable pulling work will be carried out in Cyta wells. During the works, the following traffic arrangements will be in place: (a) On the Larnaca Airport - Ayia Napa highway, by the "Kalo Chorio" roundabout, a section of the shoulder will be closed for a length of 20m. and traffic will run smoothly. (b) On the Kalou Chorio – Mosfiloti road, the embankment and/or part of the left traffic lane will be closed locally above manholes for a length of 20m. and for a total length of 3 km. approximately and traffic will be diverted to the adjacent traffic lane using the STOP & GO system. On the Nicosia-Limassol highway, in the period 09/09/2024 – 23/12/2024, on the Kalavasos bridge, bridge upgrade/repair works will be carried out. During the works, the two lanes of the highway towards Limassol, approximately 1 km long, will be closed to traffic. Traffic will be diverted to oncoming traffic, which will operate in two-way traffic. Also, the entrance to the highway, heading towards Limassol, from the old Limassol - Nicosia road at the Zygio junction will be closed and the traffic from the old road to the highway will be channelled through the Aktis tou Kivernitis junction. On the Limassol-Nicosia and Limassol-Paphos highways and the Limassol Bypass Road, in the period 14/10/2024 – 04/11/2024, between the hours of 08:30 – 16:00, excluding weekends and public holidays, cleaning works will be carried out abutments on the bypass road and at the highway exits/entrances in both directions to Nicosia and to Paphos. The cleaning work will be carried out on the shoulder of the highway, without affecting the traffic lanes. In Larnaca, the Larnaca-Dekelia beach road, from the height of the Oroklini Fire Station to the Organized Oroklini Beach (Pavilion), will be closed to traffic in both directions from 03/7/2024 and for seven months, at framework of the construction works of the "Improvement of the Larnaca - Dekelia Coastal Road Phase C" Project. During the works, traffic will be diverted via Galaxia Street in Oroklini. Drivers are urged to use caution. From Friday 19/7/2024 and for a period of approximately 6 months, work will be carried out on the construction of a roundabout, on Akamandos Street in front of the Church of Panagia Zalakiotissa in Pegeia. During the execution of the works, traffic to and from Pegeia will be diverted through Rahero street Sarakkou and Koliakas, according to the on-site road markings. Only residents will be allowed to enter the intermediate work area.In Lakatamia, works will be carried out on Tseriou Avenue and Strovolou Street, from Spyrou Kyprianou Avenue to Pefkou Street, from Friday 12/5/2023 and for a period of 20 months, in the framework of the improvement/construction of Ippokratous, Argyroupoleos and Department Avenues of Tseriou Avenue and Strovolou Street. At the same time, during the same period, as part of the reconstruction of Hippocrates Avenue, Themistokleous Street and Areos Avenue will be closed from their junction with Themistokleous Street to Nikias Street and Kentaurou Street respectively. In the province of Nicosia, in parts of the Anthoupolis-Astromeritis-Karvouna highway, from Monday 14/10/2024 until Friday 30/11/2024, excluding weekends, between the hours of 08:30 - 15:00, works will be carried out cutting/pruning acacias and other trees. During the works, the tangential traffic lane will be partially closed for a length of 50-100m. approximately, each time and traffic will be diverted to the other lane using Stop and Go. Also in the province of Nicosia, in Engomi, Strovolo and Lakatamia, from Monday 04/11/2024 until Thursday 07/11/2024, from 20:30 in the evening until 05:30 in the morning of the following day, removal and resurfacing of the existing pavement on the following streets as follows: Monday 04/11/2024: A section of Iroon Avenue from the Anthoupolis Roundabout to the Agios Panteleimons Roundabout will be closed in both directions. Drivers heading from Kokkinotrimithia to Engomi / Makedonitissa are advised to use the Circular Junction of Archangelos. Tuesday 05/11/2024: A section of Strovolos Avenue heading from Strovolos to Lakatameia, from its light-controlled intersection with Machira Street to its light-controlled intersection with Pavlou Mela Street, will be closed. Drivers heading towards Lakatamia are advised to use Machira, Kantara and Spyrou Kyprianou streets. Wednesday 06/11/2024: A section of Strovolos Avenue heading from Strovolos to Lakatameia, from its light-controlled junction with Pavlou Mela Street to the height of Troodos Avenue (Circular Hypermarket Junction 'METRO'), will be closed. Drivers heading towards Lakatamia are advised to use Pavlou Mela, Kantara and Spyrou Kyprianou streets. Thursday 07/11/2024: Section of Strovolos Avenue in the direction from Strovolos to Lakatameia, from the Circular Junction "METRO" (intersection of Strovolos Avenue with Troodos Avenue) to its light-controlled junction with Agios Stylianou Street, will be closed. Drivers heading towards Lakatamia should use the above-ground part of the Circular Junction, as the 'dip' will be closed. In all cases, during the execution of the works, there will be suitable temporary markings for the smooth channelling of traffic in the various directions. On the old Nicosia-Limassol road, between Mosfilotis and Mari on both sides directions, in the period 23/10/2024 – 15/11/2024, excluding weekends and holidays, between the hours of 08:30 – 15:00, work will be carried out to cut/prune and collect acacias and other trees. During the works, one traffic lane will be partially closed, in a length of 200m. approximately and traffic will be diverted to the adjacent lane. Traffic will be managed with the STOP & GO system. In Kyperounda, on the Karvouna-Kyperounda road, in the period 30/9/2024 – 26/11/2024, from 07:00 to 16:00 in the afternoon, construction works of retaining walls will be carried out in parts of the road. During the works, one 100m long traffic lane will be partially closed at any time. approximately every time and traffic will be alternately managed with the “STOP & GO” system with appropriate signalling. In the district of Limassol, on the road Kato Platron-Prodromos, in the period from Monday 09/09/2024 to Friday 20/12/2024, from 06:30 to 16:00, daily, CFP wall lifting works will be carried out in parts of the road. During the works, one traffic lane will be partially closed at any time for a length of 100m. approximately and the traffic will be alternately managed with the “STOP & GO” system with appropriate signalling. Also in the Pelendrio area, on a part of the Trimiklini - Pelendrio road, in the period 30/9/2024 - 26/11/2024, from 07:00 to 16:00 in the afternoon, grid cleaning works will be carried out on slopes of loose soils . During the works, one 100m long traffic lane will be partially closed at any time. approximately each time and the traffic will be alternately managed with the “STOP & GO” system with an appropriate signal donation. On the old Paphos-Limassol road, in the period 13/5/2024 – 12/5/2025 (for 12 months), construction work will be carried out to stabilize part of the road, despite Petra tou Romiou (near the KOT refreshment center in Petra tou Rumiou). During the works the part of the road being reconstructed will not be available to traffic. There will be continuous and uninterrupted traffic movement on both sides of the construction site boundaries. Traffic on the old Paphos - Limassol road from Paphos to Limassol will be diverted from the Petra tou Romiou exit (after Aphrodite Hills on the left) and from Limassol / Pissouri to Paphos from the Pissouri exit on the Paphos - Limassol highway. Also, on the old Pafos-Limassol road, in the section past Petra tou Romiou, in the period between 17/06/2024 and 16/06/2025, road stabilization works will be carried out. In particular, the works will be carried out to stabilize the slope and the floor of the roadway, as part of the 2nd Phase of the works carried out on the road, after the large landslides that had occurred since 2019. During the period of the works, 17/06/ 2024-16/06/2025, part of the old Limassol-Paphos road, despite Petra tou Romiou, will be temporarily closed to traffic in both directions to Paphos and to Limassol. the temporary signaling will be the same as it was done in the 1st Phase of Works. In particular, the necessary signalling and information will be placed on the parallel section of the Limassol-Paphos highway, as well as on the two cut-off sections on the old Limassol-Paphos road, despite the Pissouri-Petra tou Romiou west exit and by the Kouklion exit, for information of drivers intending to head towards Petra tou Romiou. In the Vassilikos area, from Thursday, February 22, 2024, fencing works are being carried out at the Vassilikos Energy Center, which will last until February, 2025. In the period October, 2024 – December, 2024, work will be carried out to upgrade bus stops and shelters, on urban roads in the provinces of Nicosia, Limassol, Paphos, Larnaca, and Famagusta. The works include excavation of footpaths to create foundations and then installation of new canopies at the bus stops.