Filenews 6 October 2025
The Electricity Authority of Cyprus announced that from Monday 06/10/2025, the mass installation of smart meters continues in all Regions in the following areas:
Nicosia: Lakatamia – Strovolos
- Area between Spyros Kyprianou Avenue, Tseriou Avenue, Ippokratous Streets, Melina Mercouri, Agios Georgios up to the height of the Pedieos River
Limassol:
- North of the port of Limassol between Vertical Port and Voukourestiou Streets up to the height of the Industrial Area
- On either side of Voukourestiou Street
Larnaca:
- Area between Griva Digeni, Thessaloniki, Faneromenis Avenue, Kalymnos and Nikou and Despina Pattichi Avenues
Famagusta: Paralimni
- On either side of April 1 Avenue, between the Ayia Napa roundabout terminal and the roundabout at the Paralimni entrance
- Within the Village, on either side of Nikou Psara Street
- On either side of Agiou Thomas Street from the height of the old Paralimni stadium to Nikou Psara Street
- On both sides of Kappari Avenue up to the boundaries of Deryneia
- Agia Triada Area – On both sides of Vrysoudion Street to the junction with Pinias Street
Paphos:
- On either side of Tomb of the Kings Avenue at the height of the Kings Avenue Mall
- On either side of Agioi Anargyroi Avenue
- Between Europe Avenue, Poseidonos, Apostolou Pavlou and Anapafseos Streets, Ptolemaida, Sotiris Markides and Giannou Kranidiotis.
It is reminded that for the safe replacement of the meter, an interruption of the supply is required for a period of time that is not expected to exceed 20 minutes. The Authority apologizes for any inconvenience.
