Filenews 13 May 2025
The Cyprus Electricity Authority announces that during the month of May, the meter replacement crews, in addition to the areas mentioned in a previous announcement, will continue the mass installation of smart meters in all EAC Regions in the following areas:
Nicosia:
Area between Stasinou Avenue and the green line from the height of the Orpheus Stadium in Nicosia to the Paphos Gate (within the walls)
Limassol: Germasogeia – Mouttagiaka
Area North of the Limassol-Nicosia Road from the height of the Industrial Area of Agios Athanasios to Agios Tychonas
Larnaca:
Vergina Area Zenon Settlement and Kamares II Settlement
South of Dr. Vassou Lyssaridi at Ipsos ton Kamara
Paralimni: On both sides of Kappari Avenue from the height of the Agia Triada roundabout to the passage of Giorki Papadopoulou Street
Part of the Area next to Archbishop Makarios III Street, North of the old Paralimni Stadium
Paphos: Area Between Kato Pervolion Street, Apostolou Pavlou Avenue, Gladstonos, Nikodimou Mylonas, Evagoras Pallikaridis, Thermopylae, Fellachoglou and Aphrodite Avenue
It is reminded that for the safe replacement of the meter, it is necessary to interrupt the supply for a period of time that is not expected to exceed 20 minutes. The Authority apologizes for any inconvenience.