Filenews 15 February 2023
The Office of Project Engineer of the Nicosia Perimeter Motorway, of Public Works, announced that, on Saturday, February 18, from 03:00am until 6:00 a.m., traffic on the Nicosia – Limassol highway in the direction of Limassol, will be closed by the exit to the Dali Industrial Area, for the construction of horizontal signage.
As specified in the announcement, transmitted by the PIO, during the execution of the works, traffic will be carried out through the exit of the Dali Industrial Area towards the old Nicosia – Limassol road and the entrance of the Dali Industrial Area despite the photo-controlled DIXAN junction to the existing motorway in the direction of Limassol.
It is also mentioned that after the completion of these works, the two traffic lanes of the Nicosia – Limassol highway in the direction of Limassol, will be shifted to their original position on the east side of the motorway, while the third lane adjacent to the central islet will be closed to traffic until next Saturday, February 25, 2023 and until the necessary restoration works of the two openings on the central islet that they were used to divert traffic.
The traffic on the Nicosia – Limassol motorway in the direction of Nicosia will remain as it is.
The Department of Public Works invites the public to demonstrate the necessary understanding and compliance with the temporary road markings and the instructions of the Police.
