On the Limassol-Nicosia highway, from Monday 10/10/2022 until Thursday 20/10/2022, except Friday, Saturday and Sunday, between the hours of 22:00 in the evening and 06:00 in the morning of the following day, works are being carried out to replace anti-glare curtains in the central islet. During the works, the right lane of the motorway will be partially closed in one direction only, for a length of approximately 1 km, and traffic will be diverted to the left lane. The Forestry Department of the Ministry of Agriculture, Rural Development and Environment informs the public that, due to forestry work, part of the forest road Platania - Apotheri - Agios Nikolaos Stegis will remain closed, from next Tuesday 11/10/2022 until Friday, 14 /10/2022. On the Limassol-Paphos highway, in the section from Erimi to Petra tou Romiou, until 26/11/2022, between the hours of 08:00 - 15:00, plantation watering works will be carried out within the central island, as well as on the slopes of the road, by the Forest Department. While the works are being carried out, the right traffic lane heading from Limassol to Paphos will be partially closed for a length of 1000m. and traffic will be diverted to the left lane.
On the Nicosia-Limassol highway, in the period 9/5/2022 – 31/10/2022, excluding weekends, work will be carried out to instal emergency doors on the central island of the highway from Alhambra to Germasogeia at twenty (20) points. During the works, the right traffic lanes to Limassol and to Nicosia will be closed in sections of 100m. approximately at each point and traffic will be diverted to the adjacent traffic lanes. On the Nicosia-Limassol highway, in the section from the Kornos exit to the Kofinos exit, from Tuesday 11/10/2022 until Tuesday 18/10/2022 (except Friday, Saturday, Sunday), from 20:00 at night until 05:30 in the morning of the following day, maintenance work will be carried out on the asphalt road surface on sections of the motorway in the direction from Nicosia to Limassol. During the works, parts of the highway towards Limassol will be closed and traffic will be diverted to the opposite traffic flow, turning it into a two-way traffic. On the Nicosia-Limassol highway, in the Alhambra area, from Monday 17/10/2022 until Thursday 20/10/2022, from 18:00 in the afternoon until 06:00 in the morning of the following day, installation work will be carried out emergency exits in the central islet. During the works, the right traffic lanes to Limassol and to Nicosia will be closed in sections of approximately 2000 metres and traffic will be diverted to the adjacent slow traffic lanes. On the highways of the province of Larnaca, in the period 03/10/2022 – 21/10/2022, daily, between the hours of 08:30 – 15:30, watering works of the plants of the central islands will be carried out by the Department of Forestry: a) on the Larnaca – Nicosia highway, from the Rizoelia roundabout to Nicosia b) on the Larnaca – Ayia Napa highway, from the Rizoelia roundabout to the airport roundabout and c) on the Larnaca – Kofinou highway, from the Kalos Chorio roundabout to Kofinou. During the works, the tangential traffic lane of the central island will be partially closed, for a length of 1500m. approximately, each time and traffic will be diverted to the adjacent lane. On the Larnaca-Agia Napa and Larnaca-Kofinou highways, in the period 15/9/2022 – 21/10/2022, between the hours of 08:30 – 16:00 every day except weekends, pruning and watering operations will be carried out by the Department of Forestry, as follows: (a) On the Larnaca - Ayia Napa highway from the Airport to the Rizoelia roundabout in both directions, pruning and watering works will be carried out on the slopes of the road and in the inner triangles of the junction, and (b) On the Larnaca - Kofinou highway, pruning works will be carried out on the slopes of the road from both directions. During the above period, one traffic lane will be partially closed and traffic will be diverted to the adjacent traffic lane. On the Larnaca-Kofinou highway, in the period 23/9/2022 – 14/10/2022, between the hours of 7:00 a.m. – 3:00 p.m., every day except weekends and holidays, works will be carried out on the shoulder of the road. During the works, the left lane of the highway will be partially closed for a distance of 500m. approximately and traffic will be diverted to the right lane using appropriate signage. Also on the Larnaca-Kofinou highway, in the period 10/10/2022 – 14/10/2022, between the hours of 07:00 – 15:00, horizontal road marking works will be carried out on parts of the highway, from the Kalos Chorio roundabout to the Kofinos exit. During the works, one traffic lane in the direction of Kofinos - Larnaca will be closed alternately at a distance of approximately 3 km and traffic will be diverted to the adjacent traffic lane with appropriate markings.On the Limassol-Paphos highway, section after the Erimi exit, 450m long. approx., as well as part of the exit from the highway to Kolossi/ Erimi, 200m long, in the direction of Limassol, will operate without a ramp, due to works for the construction of the new road network in the area of the New Limassol Stadium. The works will be carried out in the period 30/8/2022 – 07/12/2022, on weekdays and Saturdays, between the hours 07:00 – 15:00. On the Nicosia-Limassol highway, as of September 03, 2022, as part of the construction of the Nicosia Phase AI perimeter highway, the traffic of the highway, which was conducted in 4 traffic lanes on the east side, was shifted to the west side of the existing highway. The traffic of the existing highway from Limassol to Nicosia and vice versa will be carried out in 2 traffic lanes instead of 3 in a length of 2 km. approximately on the west side of the existing highway. The traffic from the exit of the industrial area of Idalio to the Tseri bypass will be uninterrupted, while the traffic from the Tseri bypass to Nicosia via the highway will not be conducted. Traffic from the Tseri bypass to Nicosia will be conducted via the old Nicosia - Limassol road from the JCC light-controlled junction. Traffic from the highway heading towards Limassol to the Idali industrial area will be conducted through the new exit constructed as part of the Perimeter Project, while traffic from the Idali industrial area to the existing highway heading towards Limassol will be uninterrupted. During the works, traffic on the highway from Nicosia to Limassol and vice versa will be conducted in one lane. The traffic from the Tseri bypass to the existing highway in the direction of Nicosia and from the industrial area of Idali to the existing highway in the direction of Limassol will not be carried out at the specified times. It is noted that traffic from the Tseri bypass to Nicosia will be conducted via the old Nicosia - Limassol road from the light-controlled junction near the JCC. The traffic from the industrial area of Idali to the existing highway in the direction of Limassol will be conducted from the entrance of Kotsiatis. It is noted that the above arrangement will last for a period of approximately 5 months. The public can be informed about the above planned works, through the website www.traffic4cyprus.org.cy, which provides a cartographic representation of the works and their effects on traffic during their execution. In Germasogeia, in the area of the Germasogeia roundabout, in the period from 10/10/2022 until the end of December 2022, works will be carried out on the eastern part of Agia Paraskevi street, from the Germasogeia roundabout to its junction with Mylou street (approximately 170 m long). During the works, traffic will be diverted to the western part of the road with two-way traffic. In Strovolos, on Spyros Kyprianou Avenue, from Monday 10/10/2022 until Thursday 13/10/2022, from 20:00 in the evening until 06:00 in the morning of the following day, road surface repair work will be carried out in Spyrou Kyprianou Avenue, from the roundabout that connects Spyrou Kyprianou Avenue with Tseriou Avenue to the Metro roundabout. During the works, sections of the affected roads will be closed for approximately 1000 meters and traffic will be diverted through adjacent lanes. In Tseri, Nicosia province, from September 1, 2022, works will be carried out on the Road within Tseri, which will last 78 weeks and is expected to be completed by February 28, 2024. Works will be carried out within the Municipality of Tseri to upgrade the main road that passes through the Municipality. More specifically, the works will include the construction of a two-lane road (with additional clockwise lanes at the traffic lights) within the Municipality of Tseri for a length of approximately 2.5 kilometres. It also includes the construction of sections of bypass roads (K. Misiaulis, Salaminas, T. Anthia, S. Papalazarou, etc.), in a total area of approximately 600 metres, which contribute to the main road. In the project, a small roundabout will be built connecting Strovolos and Agios Georgios streets at its northern end. Along the road, parking spaces will be created on both sides to serve the commercial areas of the Municipality as well as the two Primary Schools included in the under construction project. The project also includes the construction of sidewalks, the installation of traffic lights, the undergrounding of all utilities, horizontal and vertical signage, the installation of new street lighting and other related works. Depending on each phase of the works, the relevant announcements will be issued that will describe the works to be performed as well as the corresponding traffic regulations. Also in Tseri, on Analyonda Street, in the section from its junction with Poseidonos Street to its junction with Tevkrou Anthia Street, from Friday 9/9/2022 and for a period of 4 months, renovation works will be carried out, in framework of the implementation of the 1st phase of the "Road within Tseriou" project. During this phase, all traffic lanes will be closed in the aforementioned section. Drivers heading towards Nicosia are urged to use Poseidonos, Andrea Kesta, Archiepiskou Makariou III and Leontiou A' streets, which will be reversed to one-way traffic from Archiepiskou Makariou III to Pieridis Street. Drivers heading towards Analyondas are urged to use Tevkrou Anthia, Makrygianni, Tripolitsas, Papalazarou, Achilleos and Omirou streets, following the temporary markings. In the province of Larnaca, in Ormidia, in a section of Wattena Avenue, in the period 3/10/2022 – 14/10/2022, between the hours of 08:00 – 16:00, every day except weekends, network construction works will be carried out, from Cyprus Electricity Authority (ECA). During the works, a section of the road will be closed for approximately 50 meters in both directions (alternating) and traffic will be diverted to the adjacent traffic lane. In Aradippou, during the period 11/10/2022 – 27/10/2022, every day except weekends, between the hours of 08:00 – 13:00, in parts of Eleftherias, Australasia, Acropolis, Hellas and Griva Digeni avenues, works will be carried out maintenance of the greenery of the central islets, by the Municipality of Aradippou. During the works, the tangential traffic lane on both sides of the central island will be partially closed for a length of about 100-200m every time and traffic will be diverted to the adjacent lane. On the coastal road of Larnaca-Dekeleia, in Larnaca, from the roundabout of the Marine Club and at a length of 800m. approximately, as part of the construction works of the Project "Improvement of the Larnaca - Dekelia Coastal Road Phase C", from 04/10/2022 and for a period of approximately five months, works will be carried out next to the road boundaries and drivers are urged to be careful. In Meneu, in the province of Larnaca, in the period 7/9/2022 – 14/10/2022, between the hours of 07:00 – 15:00, every day except weekends, construction work will be carried out on the slope of Archbishop Makarios III Avenue, from junction of Eleftheria Avenue towards Dromolaxia - Meneou and for a length of 200m. about. During the works, one traffic lane of Archbishop Makarios Avenue III will be closed and traffic will be diverted to side streets using appropriate signage. In Nicosia, on Markou Drakou Avenue, from Thursday 13/10/2022 until Thursday 20/10/2022, between the hours of 07:00 - 15:00, work will be carried out to install a drainage system. One lane will be closed during the works. On Nikis Avenue, in Nicosia, in the section near the Gavrielides traffic lights, between Samos and Kilkis avenues, from 06:00 on the morning of Saturday 15/10/2022 until 21:00 on the evening of Sunday 16/10/ 2022, construction works will be carried out on a storm drain and sewage system. During the works, the section of Niki Avenue in Nicosia between the Samos and Kilkis corridors will be closed. Traffic heading towards Nicosia will be diverted via Samou Street and Kyriakou Matsi Avenue, heading towards Acropolis via Kennedy Avenue and Athos and 25th March streets. In the district of Nicosia, specifically in Deutera, on Griva Digeni Avenue, Anthoupoli – Palechorio road, from Friday, May 27, 2022 and for a period of five (5) months, construction work will be carried out on a roundabout at its junction with Agia Marina Street. During the works, traffic from Anthoupoli to Palaichori and vice versa will be diverted through a temporary bypass road of approximately 300m length. The junction of Griva Digeni Avenue with Agia Marina Street will be closed and drivers from Palaichori to Deutera are urged to use the previous exit towards Anagyia – Pano Deutera. In the district of Limassol, the Arakapa - Sykopetras road will remain closed due to improvement works, from October 17, 2022 to November 4, 2022, around the clock. The public can use the Sykopetras - Agios Konstantinos road. In Germasogeia, construction work on the Germasogeia bypass road continues as normal. From Sunday, August 7, 2022, the construction work of the next phase of the Project will be carried out, which will last 6 months and includes, among other things, the reconstruction/upgrading of a 400m long section of the road on Agia Paraskevi Street up to the southern part of the Germasogeia roundabout, the reconstruction of Mylou Street and the construction of a roundabout at the junction of the new Mikis Theodorakis Avenue with Agia Paraskevi and Milos Streets. During the construction work of this phase the following traffic arrangements will apply: (a) The junction of Agia Paraskevi and Mylos Streets will be closed and the section of Agia Paraskevi Street south of Tellyrias Street will temporarily operate as a cul-de-sac. Traffic from/to Germasogeia and from/to Limassol will take place via the new bypass road and its connections with Agia Paraskevi street from Isabella, Patron and Tellyria streets. The access of Agia Paraskevi street towards Limassol is expected to be handed over to traffic around the end of October 2022. (b) Mylou Street will be closed and its eastern section, from its junction with Potamias Street, will temporarily function as a dead-end street to serve merchants and residents. (c) Traffic from/to Muttayaka will be able to be done via Potamias Street (east) or via the new bypass road and Agios Georgios Street. In Limassol, at the junction of Spyros Kyprianou Avenue and Nikou Pattichis Street, from Friday 7/10/22 until Saturday 15/10/22 road works will be carried out by SALA as part of the Great Flood Protection Project of Greater Limassol. During the works, the northbound lanes of the section of Spyros Kyprianou Avenue, from its junction with Nikos Pattichis Street to its junction with Vasileos Konstantinou Street, will remain closed and traffic will only be allowed in the southbound lanes heading from east to west. Traffic on Spyros Kyprianou Avenue from west to east will be diverted through Nikos Pattichis Street to other streets. Also, on Nikou and Despinas Pattichi Street, in the section from its junction with Spyrou Kyprianou Avenue to its junction with Makariou III Avenue, in Limassol, from Monday 17/10/2022 until Thursday 3/11/2022, except Friday, Saturday and Sunday, between the hours of 22:00 in the evening and 06:00 in the morning of the following day, construction work will be carried out on a brick island and temporary parking spaces. During the works, one lane in each direction will be partially closed for approximately 300 metres and traffic will be diverted to the other lane. The public is requested, during the above period, to avoid parking vehicles along Nikou and Despina Pattichi streets. Also within the framework of the construction works of the Great Flood Protection Project of the Centre of Limassol, on Viktoros Ugo Street, from its junction with Athinaidos Z. Lanitou Street to Orfeos Street, in the Municipality of Limassol, rain gutter installation works will be carried out. The work is expected to last until Monday, October 24. This section of the road will be closed and the public is urged to be careful and comply with the temporary road markings to divert traffic. Works will be carried out on Viktoros Ugo Street, from its junction with Nikolaou P. Laniti Street to Golgon Street, in the Municipality of Limassol, from Monday, October 10, also within the framework of the Great Flood Protection Project of the Center of Limassol. The work is expected to last until Monday, October 24. This section of the road will be closed to traffic and the public is asked to be careful and obey the temporary road markings. On Feyzit Pasha Street, in the Municipality of Limassol, as part of the Great Flood Protection Project of the Center of Limassol, from Wednesday 31 August, works will be carried out by the Sewerage Council of Limassol - Amathus. The work is expected to be completed by Thursday, October 27. During the works the road will be closed and the public is asked to comply with the temporary road markings to divert traffic. In Paphos, in the Geroskipou area, from Tuesday, April 5, 2022, until Monday, March 6, 2023, the connecting road B6 - A6 (Limassol - Paphos), will be closed to traffic, due to roundabout construction works on Kinyra Street in Geroskipou. During the works drivers and pedestrians will be able to use a temporary detour that has been constructed for this purpose. On the old Nicosia – Limassol road, period 10/10/2022 – 21/10/2022, every day except the weekend, between the hours of 08:00 – 17:00, water pipeline installation works will be carried out by the Water Development Department. During the works, on a part of the old road, just before the exit to the Satellite Station in the direction of Limassol, one direction lane will be closed for a length of approximately 50 metres and the movement of traffic will be done using traffic light markings.