Sunday, December 19, 2021

MAJOR ROAD WORKS

 


On the Nicosia-Limassol highway, from Saturday, September 18, 2021 and for a period of about three (3) months, at the Kornos Junction, construction works will be carried out on the new Kornos exit on the highway, in the direction of Limassol. During the works, the left lane, after the exit of Kornos on the highway, in the direction of Limassol, will be closed for 400m. about and the traffic to Limassol will be diverted to the right lane. On the Nicosia-Limassol highway, from Wednesday, April 14, 2021, improvement works will be carried out at the Kornos junction. The works will last 15 months and concern on the one hand the improvement of the existing branches of the junction on the west side of the highway, for entry on the highway from Korno / Pyrga to Nicosia and for exit from Limassol to Korno / Pyrga, and on the other hand the creation of a new entrance side, from Korno / Pyrga to Limassol. Also on the Nicosia-Limassol highway, in the direction of Nicosia, on Saturday, October 16, 2021 and for a period of about two (2) months, at the Kornos Junction, works will be carried out to improve the existing exit from Limassol to Kornos. During the works, the left lane before the exit of Kornos to the highway in the direction of Nicosia will be closed for about 400m. and the traffic to Nicosia will be diverted to the right lane. In Limassol, on Makariou GD Avenue, in the section from the roundabout of Agios Nikolaos to the junction with Anastasiou Sioukri Street, on Tuesday 21/12/2021, from 21:00 in the evening until 06:00 in the morning The next day, a pedestrian overpass construction work will be carried out. During the works, the section of Makarios GD Avenue from the roundabout of Agios Nikolaos to its junction with Anastasiou Sioukri Street will be closed and traffic will be channelled through Vyronos, Anastasiou Sioukri and adjacent secondary streets. road network. In the province of Limassol, in a section of the Parekklisia - Kellaki road on Grigori Afxentiou Street, from Monday 01/11/2021 - 31/12/2021, a Private Contracting Company will carry out the installation of a Pipeline for the construction of a Sewerage Network. of SALA. During the works, one lane of the road will be closed in a length of approximately 120 m and the traffic will be managed alternately with the operation of a mobile system of temporary traffic lights. In Nicosia, Digeni Akrita Avenue will be closed from its junction with Androkleous Street and until its junction with Nikodimou Mylona Street, from Monday, December 13, 2021 and until Wednesday, December 22, 2021, due to its strengthening works. existing rectangular rainwater drain. Drivers are kindly requested to use the bypass through Androkleous - Pindarou and Eugenia Theodotou streets for the direction to Pallouriotissa. For the direction to Lycabettus, drivers are kindly requested to use Nikodimou Mylonas and Kallipoleos streets. In the province of Nicosia, on Monday and Tuesday 20 and 21/12/2021, from 21:00 in the evening until 06:00 in the morning of the next day, road repair works will be carried out at the following road junctions: Giannis Kranidiotis Avenue with Archbishop Kyprianou, in Latsia Nicosia - Palaichori Road, from Anthoupolis Roundabout with Anthoupoleos Street

During the works, the contributions will be closed in sections 500m long. about each time and the traffic will be through the adjacent lanes. On the old road Nicosia-Limassol, in the period 22/10/2021 - 31/12/2021, every day except Sundays and holidays, between the hours of 07:00 - 16:00, construction works of water pipes will be carried out by the Department of Water Development. During the works, part of one lane of the road, from the ‘Hoirokoitia reservoir’ to the TAY pumping station in Kofinou, in the direction of Kofinou, will be partially closed in a length of 100m. approximately (with a total length of approximately 850m.) and the traffic will be moved in the adjacent traffic lane, using temporary traffic lights. Also on the old road Nicosia-Limassol, in the context of the construction works of Phase 1 of the road network of the Vasilikos Energy Center, in the period 24/10/2021 - 23/4/2022, the eastern road that connects the road with the port of Vasilikos will is closed to traffic. During the works, the traffic traffic to and from Vasiliko will be channelled to the respective west road, through Marie, except for vehicles and pedestrians that will move from and to temporary properties for which the appropriate arrangements will be made. On the old road Limassol-Paphos, by Erimi, in the period 4/12/2021 - 19/12/2021, wall construction works will be carried out During the works, one 100m long lane will be closed. traffic will be alternated with the operation of a temporary mobile traffic light system.