On the Nicosia-Limassol motorway, from Wednesday 14 April, 2021 work will be carried out to improve the Kornos junction. The work will take 15 months and concerns on the one hand the improvement of the existing branches of the junction on the west side of the motorway, for entry to the motorway from Korno/ Pyrga to Nicosia and for exit from Limassol to Korno/ Pyrga, and on the other hand the creation of a new entrance on the east side, from Korno/ Pyrga to Limassol.
Also on the Nicosia-Limassol motorway, from Monday 9/8/2021 and for a period of about two (2) months, work will be carried out at the Kornos junction to improve the existing entrance from Kornos to the motorway towards Nicosia. During the work, the entrance from Kornos to the motorway towards Nicosia will be closed and traffic to Nicosia will be channelled to the Sias junction via the old Nicosia-Limassol road.
In Nicosia, on Spyros Kyprianou Avenue, from its junction with Limassol Avenue to the Tseri roundabout, from Monday 14/6/2021 until Friday 18/8/2021,from 8:00 p.m. to 6:00 a.m. the next morning, road repairs will be carried out. During the work the left lanes of traffic will be closed in sections about 1000m long, and traffic will be traffic through the Limassol, Joseph Joseph and Constantinople avenues to Tseri Avenue.
In Nicosia province, from Monday 19/4/21and for a period of 6 months, except Saturday, Sunday and public holidays, between the hours of 07:00–17:00, road repair work will be carried out on roads in various areas. During the execution of the work, one lane will be partially closed at a length of approximately 200 metres and traffic will be carried out in the other lane, using a "STOP & GO" sign.
In the Limassol province, on the road of Agios Athanasios-Mathikonis, during the period 20/7/2021–13/8/2021, between the hours 07:00–15:30, daily outside weekends, work will be carried out on the construction of walls by a private Contracting Company. During the work, one 100m-long lane will be partially closed at any time. approximately each time and traffic will be managed alternately with temporary traffic lights.
On the old Nicosia-Limassol road, as part of the construction work of the Road Network of the Vasilikos Energy Centre, during the period 24/4/2021-23/10/2021,the eastern road connecting the old Nicosia-Limassol road with vasilikos port will be closed to traffic. During the work, traffic to and from Vasilikos will be diverted to the corresponding western road, via Marie, except for vehicles and pedestrians moving to and from similar properties for which the appropriate arrangements will be made.
On the old Nicosia-Limassol road also, during the period 21/06/2021–13/08/2021 daily except weekends and public holidays, between the hours 07:00 – 16:00, construction work will be carried out on water pipelines by the Department of Water Development. During the work, part of one lane of the road, from the "Pig Tank" to the pumping station of the TY in Kofinou towards Kofinou, will be partially closed at a length of about 100 meters (total length of about 850 meters) and traffic will be traffic in the adjacent lane, using temporary traffic lights.